Knockdown-Rebuild Construction Loans: Funding the Gap From Demolition to Handover
ADS Team
Author
November 19, 2026
about 1 hour ago
1
views

In short: Knockdown-rebuild construction loans combine the loan you already have on the property with a construction facility for the new house, secured on the same land. Once the old house is demolished, the lender's security is the land alone until the new one rises, so the LVR during the build is measured against land value. You also carry rent, demolition and holding costs for the length of the build, and at handover the loan converts or is refinanced against the finished home.
Key takeaways
- Your existing loan and the new construction facility usually sit with one lender, secured on the same title.
- After demolition the security is the land: the old house drops out of the LVR until the new one is built.
- Demolition, asbestos removal and service disconnections are often outside the building contract and paid from your own funds.
- In the worked example, holding costs outside the contract total about $98,463 over 12 months, plus $45,000 of demolition.
- Lenders test serviceability on the full new debt, and many also count the rent you pay during the build.
- At handover, a valuation of the finished home can lower the LVR and open better pricing if you refinance.
How does a knockdown-rebuild construction loan work?
You already own the house and usually owe money on it. A knockdown-rebuild adds a construction facility for the new house on top of that debt. Because both are secured on the same title, and construction lenders want first-ranking security over the land, the usual structures are:
| Structure | How it works | When it suits |
|---|---|---|
| Vary the existing loan with your current lender | The existing loan stays; a construction portion is added and drawn in stages | Your lender offers construction loans at competitive pricing |
| Refinance to a new lender | The new lender repays the existing loan at the start and sets up land and construction portions | Your lender does not offer construction loans, or another prices the whole debt better |
| Pay down first, then borrow | Savings or other equity reduce the existing debt before the build | You want a lower LVR and smaller assessed repayments |
Either way, the lender treats the existing debt as the land portion of the construction loan: drawn in full from day one, while the construction portion is drawn in stages against the building contract. Interest runs on both. A separate construction loan from a second lender behind your current one is rarely available for a home rebuild, for the same first-ranking reason.
What happens to the security when the house comes down?
The day the house is demolished, the lender's security changes. Until the new house is built, it is the land plus whatever work is in place. That is why a knockdown-rebuild valuation reports a land value as well as the as-if-complete value of the new home.
In many established suburbs an older house contributes relatively little to the value - most of it is in the land - so the effect on the LVR is smaller than people fear. On a newer or larger existing house, demolition can push the LVR on the existing debt up sharply until the rebuild adds value back.
| Point in the project (example) | Security value | Debt | LVR |
|---|---|---|---|
| Before demolition: old house and land | $1,200,000 | $500,000 | 41.7% |
| After demolition: land only | $1,000,000 | $500,000 | 50.0% |
| At handover: new home | $1,900,000 | $1,250,000 | 65.8% |
Lenders size the whole facility on the as-if-complete value, often with a loan-to-cost test as well, so what matters at the start is that land value plus the contract price supports the total debt. Our LVR and equity calculations guide shows how to run all three LVRs yourself.
What do demolition and site preparation involve, and who pays?
Demolition is often outside the building contract. Some builders offer it as part of a package; many expect a clear, level site with services disconnected before they start. If it sits outside the contract, the lender usually will not fund it from the construction portion, so it is paid from your own funds before the first draw.
| Item | Timing | Notes |
|---|---|---|
| Demolition permit or consent | Before demolition | Requirements vary by council and state |
| Service disconnections: power, gas, water, sewer, telecommunications | Before demolition | Each authority has its own lead time |
| Asbestos inspection and removal | Before or during demolition | Common in older homes; licensed removalists only |
| Demolition and site clearing | Usually weeks, not months, on site | Quote should cover tip fees and permitted tree removal |
| Soil test and survey for the new design | Before the contract is final | Affects slab design and provisional sums |
The worked example below uses a $45,000 demolition quote including asbestos removal - an example figure. Get your own quotes, because older homes and difficult access can cost far more.
Timing matters as much as cost. Demolish too early and you carry a vacant block while the building permit is finalised; too late and the builder's start date slips. Most owners line demolition up to finish shortly before the builder's site start, and only once the construction loan is in place.
Where do you live during the build, and what does it cost?
Somewhere else, for as long as the build takes plus a margin. Rent, two moves and storage are real costs of a knockdown-rebuild, and they overlap with rising interest as the construction draws mount. Builders are busy: the ABS counted 95,447 new houses under construction in the June quarter 2026 in its Building Activity release, and a full pipeline is one reason build times stretch.
Lenders care because rent competes with repayments. For a home you will live in, the lender must make reasonable inquiries about your situation and verify it under the responsible lending obligations ASIC sets out, and many include the rent you will pay during construction as an expense. Banks test repayments on the full new debt at least 3 percentage points above the loan rate, the buffer APRA kept on 28 May 2026.
Moving out can also change your state tax position for the year. Victoria's State Revenue Office, for example, lists an exemption for construction or renovation of a principal place of residence among its land tax exemptions. Check your own state's rules and conditions before you demolish.
Worked example: the full cost from demolition to handover
For illustration only - example figures and an example rate of 6.5%, not an offer. Existing loan $500,000; land value $1,000,000; demolition $45,000 paid in cash; a $750,000 fixed-price contract over a 12-month build, drawn at months 0, 2, 4, 6, 9 and 12 (5%, 15%, 20%, 25%, 20% and 15%); rent $700 a week; removals and storage $6,000.
| Cost outside the building contract | Amount over 12 months |
|---|---|
| Interest on the existing $500,000 ($500,000 × 6.5%) | $32,500 |
| Interest on construction draws as they are made | About $23,563 |
| Rent ($700 × 52) | $36,400 |
| Removals and storage | $6,000 |
| Holding costs | About $98,463 |
| Demolition and asbestos removal | $45,000 |
| Total cash costs outside the contract | About $143,463 |
The construction interest is 6.5% ÷ 12 on each draw for the months it is outstanding: $37,500 for 12 months, $112,500 for 10, $150,000 for 8, $187,500 for 6 and $150,000 for 3, with the final $112,500 drawn at handover. Run your own schedule through the construction progress draw calculator.
Monthly cash flow climbs through the build. At the start you pay about $2,708 of interest plus about $3,033 of rent, roughly $5,742 a month. In the last three months, interest on the $1,137,500 then drawn is about $6,161 a month, roughly $9,195 with rent - and at handover the balance reaches $1,250,000 and principal starts.
How is the loan converted or refinanced at handover?
At practical completion the final draw is paid, the lender's valuer inspects, and the loan converts to principal and interest unless you have arranged otherwise. It is also the natural point to review the whole debt. The finished home is valued, and in the example a $1,250,000 debt against a $1,900,000 home is about a 65.8% LVR, which may sit in a better pricing tier than the construction loan did.
Refinancing at completion means a new valuation, a new credit assessment, discharge and establishment costs, and possible break costs on any fixed portion. Weigh those against the rate difference over the years you expect to hold the loan; our guide to the refinancing process walks through the steps.
If you want an offset account or a different split once you move in, ask before the construction loan is set up. Some lenders allow the change at conversion without a full refinance.
What do lenders need for a knockdown-rebuild?
- A statement for the existing loan and the title for the property.
- A fixed-price building contract, with plans and specifications for the new home.
- The demolition quote, permit and, for older homes, an asbestos report.
- The planning or building approval for the new home.
- The builder's licence, home warranty certificate and contract works insurance.
- Evidence of funds for demolition, holding costs and a contingency.
- Your lease, or the expected rent, for where you will live during the build.
Common mistakes: demolishing before the construction loan has settled; assuming the old house's building insurance still protects you once it is gone (arrange cover for the vacant site); and budgeting rent for the contract period only, with nothing for delays and final inspections.
What should you do next?
Ask your current lender whether it offers construction loans and on what terms, then price the whole project: demolition, the contract, a contingency, and holding costs for the build plus a margin. Read how construction loan progress payments work so you know what each stage will draw. When the numbers hold, post one construction loan request on ADS and 200+ verified lenders and brokers can ask about it. This is general information, not financial or tax advice.
Frequently asked questions
Can I keep my existing loan when I knock down and rebuild?
Often, if your lender offers construction loans: the existing loan stays and a construction portion is added. If it does not, a new lender can refinance the existing debt and set up the construction facility. Construction lenders generally want first-ranking security over the land, so a separate loan from a second lender is uncommon.
Does demolition reduce how much I can borrow?
It removes the old house from the security until the new one is built, but the facility is sized on the as-if-complete value of the new home. If land value plus the contract price supports the total debt, demolition rarely changes the limit; it does change the LVR during the build.
Will the lender fund the demolition?
In most cases only if demolition is part of the building contract. If you engage a demolisher separately, expect to pay from your own funds before the first draw, together with asbestos removal and service disconnections.
Do lenders count the rent I pay during the build?
Many do. For a home you will live in, the lender must look at your real expenses, and rent during construction is one of them. Some assess the rent alongside the full new repayments; others let it fall away at completion. Ask how your lender treats it before you rely on a borrowing figure.
How long should I budget to rent during a knockdown-rebuild?
Budget for the demolition period, the contract build time and a margin for weather, trade delays and final inspections. In our example the build alone is 12 months. A lease with some flexibility at the end avoids paying for a place you no longer need, or being without one if the build runs late.
Related reading
- LVR and Equity: Worked Calculations
- Refinancing Your Home Loan: The Complete 2026 Process
- Construction Loans: How Progress Payments Work
Sources
- Building Activity, Australia, June quarter 2026 (new houses under construction) — Australian Bureau of Statistics
- Responsible lending obligations for credit licensees — Australian Securities and Investments Commission
- APRA maintains macroprudential settings: 3 percentage point serviceability buffer (28 May 2026) — Australian Prudential Regulation Authority
- Land tax in Victoria, including the exemption for construction or renovation of a principal place of residence — State Revenue Office Victoria
Information current as at 24 October 2026.
General advice warning: This article contains general information only. It does not take into account your objectives, financial situation or needs, and it is not personal credit or financial advice. Consider whether it is appropriate for you and seek advice from a licensed credit representative before acting.
Any interest rate shown is an example only and is not an offer of credit. Where a rate is quoted, the applicable comparison rate is available from the relevant lender and should be considered alongside it.
Tags
Related Posts

Equipment Finance for Earthmoving and Civil Machinery
Earthmoving machines are usually funded with equipment finance secured over the machine itself: a chattel mortgage if you want to own it from day one, a finance lease or hire purchase if you prefer...

Raising Money From Private Investors: ASIC's Rules on Sophisticated Investors and Small Offers
Raising money from private investors is fundraising under Chapter 6D of the Corporations Act, and an offer of shares or notes needs a disclosure document unless an exemption covers it. The two exem...